Cheshire East and West

Project Overview

M&J were commissioned to re-roof 4 different schools in Cheshire, largely over the school summer holidays.

The roofing comprised of a combination of strip up and overlay with a combination of flat board insulation and cut to falls.

All came with a 25 year single point warranty. The whole project was delivered on time and within budget.

Charring Cross Hospital

Project Summary

Following appointment of the roof refurbishment works on the various areas of Charing Cross Hospital, M&J developed detailed working schedules, enabling the roofing works to run in synchrony with the extensive enabling M&E works required and ensuring that the projects were completed on time and within budget.

Client Commendation:

“This was a high profile project for our department with potentially significant business continuity (patient diagnostics) and high equipment repair and replacement cost risks if the works weren’t carried out with this in consideration.

Thankfully your detailed scheduling with our Project Manager and the conscientious work of your installation team, working in close collaboration with the Trusts other Contractors ensured that these risks were never realised.”

Shane King | Head of Estates Operations
The Imperial NHS Trust

 

DOWNLOAD PROJECT PROFILE Contact Us

Bowmansgreen School

Project Overview

Bowmansgreen School suffered with notorious water ingress issues and lacked the image to impress Ofsted inspections. Leak pathways originated from many aspects of the building envelope, specifically located around windows and roof lights. M&J Group carried out refurbishment works to these areas during half-term to minimise disruption and now the school not only looks appealing but is also leak free.

With over 2300m2 of flat roofing re-covered, M&J Group also carried out asbestos removal, drainage works, installation of a new permanent handrail system, large scale curtain walling, window replacement, electrical works and internal decoration.

All works were managed without incident, completed 6 weeks ahead of program and under the client’s budget.

DOWNLOAD PROJECT PROFILE Contact Us