Project Overview

A Project value of over £700k and all carried out during term time, except for utilising the Easter Holidays. All rooms had to be decanted before works could start, which was done with close liaison with the school management team. This site was also within a conservation area.

Workmanship was of an extremely high quality, with the client commenting that it was the best slate roof he had ever had the pleasure of dealing with. Attention to detail was a must, given the building’s status in a conservation area. All slates had to be double lapped, with Klober dry ridge and hip details throughout. All re-used slates were positioned on the sections of roof that could be best viewed from the public (Front entrance, side section adjacent to main road etc).

M&J repointed and formed new lead details around the Bell Tower as part of the works, restoring it back to its original grand state. Lead detailing was also used on the plinths and valleys

All fascias and soffits were decorated alongside the re-roofing works.