Ashtree School | Case Study

Ashtree School | Case Study

Ashtree School suffered with severe roof drainage issues which often resulted in internal leaks. When M&J arrived on site over 70% of the flat roofs were covered in standing water.

Water build up on the roof
Water build up on the roof

M&J carried out a complete re-design of the roof including making redundant all internal outlets and installing a double tapered insulation scheme, which drained rain water to the outside edge.  M&J also carried out the installation of Fascias, Deep Flow Aluminium Guttering & Downpipe Systems along with the complete re-design of the Groundwork Drainage due to historical problems. The works also included the installation of a temporary Trackway to gain access to difficult areas of the school and reduce damage caused by heavy vehicles moving around the site.

As part of our continued partnership with the schools we work with, our Business Development Manager (Richard James) carried out an assembly with the children at Ashtree School to explain what the works involved, the importance of health and safety around the site and which included a demonstration of the PPE items with children being dressed up as a construction worker!

Headteacher, Ms E Kirwin, has this to say:

 “I was very grateful to Richard for introducing the work, that M& J Group are doing, to the pupils. The assembly was fun, with lots of props and a clear message about the Health and Safety aspects of the work. Pupils had the chance to ask their questions and demonstrate their knowledge too. Well done.”

 

Gold Excellence in Health & Safety

The M&J Group have achieved a “Gold Excellence in Health & Safety” award under the 2014 Safety in Roofing Awards Scheme. sira_logo_gold

M&J Group have been awarded the prestigious “Gold Excellence in Health & Safety” award under the 2014 Safety in Roofing Awards Scheme.

 Group CEO, Peter Henrickson, had this say:

 “Achieving this award is recognition of the hard work the management team at M&J put in to ensuring our sites operate safely and proves to the industry and clients alike,  that the M&J Group take safety seriously.  Our message is clear  “Your safety is our priority” and we are very proud of this achievement”

 

 

Finalists for the Roofing Awards 2015

We are pleased to announce we have been shortlisted as finalists for the Roofing Awards 2015.

After another record breaking year in which the M&J Group continued to achieve a sustained level of growth, we are pleased to have been shortlisted for this years 2015 Roofing Awards organised by The NFRC.

M&J Group were shortlisted for two projects under the Reinforced Bitumen Membrane category. These projects included a major re-roofing project at the Hammersmith Hospital, in partnership with the Neo-Natal Unit and for another major re-roofing project at the Culham Science Centre – The home of the UK’s Atomic Energy Authority.

Read more