Project Overview

This project comprised of stripping, re-decking and waterproofing 12,000m2 of an industrial unit all while keeping the building 100% watertight and debris free due to the nature of production in the building.

This was done using a combination of moisture matting and debris / safety netting and phased throughout the building to ensure minimum disruption.

M&J also installed a large number of barrel vault roof lights which significantly improved the natural light into the factory. All of these works totalled 17,300 man hours without a single H&S incident.

DOWNLOAD PROJECT PROFILE Contact Us