Bowmansgreen School

Project Overview

Bowmansgreen School suffered with notorious water ingress issues and lacked the image to impress Ofsted inspections. Leak pathways originated from many aspects of the building envelope, specifically located around windows and roof lights. M&J Group carried out refurbishment works to these areas during half-term to minimise disruption and now the school not only looks appealing but is also leak free.

With over 2300m2 of flat roofing re-covered, M&J Group also carried out asbestos removal, drainage works, installation of a new permanent handrail system, large scale curtain walling, window replacement, electrical works and internal decoration.

All works were managed without incident, completed 6 weeks ahead of program and under the client’s budget.

DOWNLOAD PROJECT PROFILE Contact Us

Henlow Academy

Project Overview

M&J Group provided the design specification, utilising an Alumasc Mastergold Build Up Felt Roofing system incorporating a 25 year single point guarantee.

All refurbishment works were carried during term-time with minimal disruption to the school and pupils. Since these large refurbishment works, Henlow Academy are now watertight with long-term contractual guarantees for peace of mind.

Client Commendation

“Henlow Church of England Academy appointed M&J Group to carry out a project at the premises. The works involved the completed re-roofing of the main school buildings.

The company managed the project to an excellent standard, both in quality of workmanship and quality of service. Customer care, communication and response times were also excellent.

The Academy would not hesitate to recommend this company for consideration in tender invitations for projects of a similar nature.”

 

DOWNLOAD PROJECT PROFILE Contact Us

Nestle

Project Overview

The Nestle Building received an overlay of the existing Asphalt roof, with a single layer High Performance Felt system as the existing waterproofing system had reached the end of its reliable service life. A large job, at over 7,000m2, the Nestle Building demonstrated M&J’s ability to deliver high quality works within budget and within an expected time frame.

Being a food processing factory, with no option to reduce or shut down the plant, M&J ensured that the works would have minimal effect on Nestle’s business through detailed planning throughout the process, including scaffolding design to safely enable more areas to remain open and accessible. Through careful consideration and value engineering, M&J managed to save Nestle £10s of thousands of pounds by offering a more suitable waterproofing solution which was both quicker and more robust than the previous option.

DOWNLOAD PROJECT PROFILECONTACT US