1-11 Greenfields Close

Project Overview

The M&J Group were appointed to undertake a full roofing upgrade across a residential block in Bedfordshire. The programme focused on delivering improved thermal performance, replacing ageing and hazardous roofing materials, and ensuring minimal disruption to residents throughout.

The works formed part of a wider asset improvement programme enhancing energy efficiency, long‑term durability, and compliance with current building regulations.

Project Scope

Insulation Upgrade to Comply With Modern U‑Values

The existing roof structure was stripped back to allow installation of upgraded insulation materials. This significantly improved the building’s thermal efficiency and ensured full compliance with current U‑value requirements, supporting reduced heating costs for residents.

Removal of Asbestos-Containing Roofing Materials

The project involved the safe removal and disposal of asbestos‑containing slates. All works were carried out in strict accordance with health & safety regulations, and licensed waste carriers were used for proper disposal.

Full Roof Replacement

Following removal, the roofs were rebuilt using high‑quality slate-effect tiles, providing:

  • Enhanced weather resistance
  • Improved longevity
  • Clean, modern appearance

Images show the newly installed pitched and flat roof sections, including vent tiles, ridge work, waterproofing layers, and a newly installed flat‑roof skylight.

Scaffold Erection & Site Safety

A full perimeter scaffold was installed, complete with safety barriers and access platforms. This ensured safe working at height across the multi‑roof layout and protected both operatives and residents.

Tenant Liaison

Close communication with residents was maintained throughout the programme. Dedicated tenant liaison ensured:

  • Residents were informed of schedules
  • Access requirements were clearly agreed
  • Disruption was minimised
  • Safety considerations were clearly communicated

Project Outcome

The completed roofing works have delivered:

  • Significantly improved thermal performance
  • Reduced energy loss on all residential units
  • Elimination of hazardous asbestos materials
  • Enhanced waterproofing and weather protection
  • Improved property aesthetics and long-term asset value

 

The project was delivered efficiently, safely, and in full compliance with relevant regulations and client specifications.

Related Projects

Lincroft Academy – Phase 2

Construction / Education / Projects

Lincroft Academy – Phase 2
View Project

St Crispin Retirement Village

Construction / Projects / Real Estate

St Crispin Retirement Village
View Project

1-11 Greenfields Close

Pitched roofs / Projects / Roofing

1-11 Greenfields Close
View Project

Request a Call Back

Please note: by completing this form, you accept that M&J Group may contact you from time to time about services which might be of interest to you. You may unsubscribe from these emails at any time and we will never share your information.