The Harris Primary Academy project involved the comprehensive refurbishment of both the building envelope and internal teaching spaces. Initially procured under a PCSA, the scope was developed into a cost-effective scheme focusing on M&E design, roofing surveys, asbestos management, and external envelope works.
The key objectives were to modernise the academy, address roofing failures, improve building performance, and deliver phased internal refurbishments — all while the school remained occupied. Works were carefully scheduled to minimise disruption during term time, with high-impact activities completed in holiday periods.
Roofing Works:
M&E Systems:
Internal Refurbishment:
Fire Safety Upgrades:
The regeneration of Harris Primary Academy delivered a modern, safe, and energy-efficient learning environment. The phased programme allowed the school to remain fully operational throughout, while cost-effective solutions unlocked additional value that was reinvested into other elements of the scheme.
The school was transformed both visually and functionally, with upgraded M&E systems, enhanced fire safety, and revitalised classrooms.
“Harris Academy are one of AMR’s biggest clients and HPAC is the flagship site within the Trust’s portfolio. The project was always going to be a challenge – a loose initial brief and an occupied tight site. M&J Group worked brilliantly with us all to develop the original scope into a deliverable project, bringing savings where possible and releasing monies for other elements. The school was truly transformed and the donation of new pupil entrance gates with the rebranded School name was the icing on the cake!” – AMR Consult
Please note: by completing this form, you accept that M&J Group may contact you from time to time about services which might be of interest to you. You may unsubscribe from these emails at any time and we will never share your information.