Nene Park Academy

Project Overview

The project involved completely removing the current single-ply waterproofing system and replacing it with a new Alumasc three-layer system.

Project Scope

This included installing tapered insulation and applying all layers using hot air. Additionally, new permanent edge protection/handrail and PV panels were installed.

Brickwork repairs were necessary. Since the building was new, it adhered to updated regulations that were different from those we encountered in previous refurbishment projects. These regulations included insulated parapet upstands. To accommodate this, we had to mechanically attach insulation to the vertical face, which also led to changes in the trim and drip detail. Additionally, adjustments were made to the lightning conductor system to account for the original metal capping. Raising the roof height with new insulation meant that the parapet was no longer tall enough, necessitating the installation of permanent edge protection.

Related Projects

Lincroft Academy – Phase 2

Construction / Education / Projects

Lincroft Academy – Phase 2
View Project

St Crispin Retirement Village

Construction / Projects / Real Estate

St Crispin Retirement Village
View Project

1-11 Greenfields Close

Pitched roofs / Projects / Roofing

1-11 Greenfields Close
View Project

Request a Call Back

Please note: by completing this form, you accept that M&J Group may contact you from time to time about services which might be of interest to you. You may unsubscribe from these emails at any time and we will never share your information.