Project Summary

This project involved the refurbishment of over 1,200m2 of flat roofing to a fully operational hospital wing in central London.

The specification called for the existing roof construction to be stripped back to the metal decking and replaced by a Marly system specification providing a 20 year guarantee.

The project was completed within a tight contract period with no interruption to the use of the hospital building at that time and all in accordance with the strict site re-strictions imposed by the client and the nature of their work.

For this particular project the client requested a “no-flame” specification to negate the risk of fire.